New Gold Inc.
AMEX•NGD
CEO: Mr. Patrick Godin Asc., B.Sc., Eng., M.Eng., P.Eng.
板块: Basic Materials
行业: Gold
上市日期: 2004-11-18
New Gold Inc., an intermediate gold mining company, develops and operates of mineral properties in Canada. It primarily explores for gold, silver, and copper deposits. The company's principal operating properties include 100% interest in the Rainy River mine located in Northwestern Ontario, Canada; and New Afton project situated in South-Central British Columbia. New Gold Inc. is headquartered in Toronto, Canada.
联系方式
Brookfield Place, Suite 3320 181 Bay Street, Toronto, ON, M5J 2T3, Canada
416-324-6000
市值
$7.19B
市盈率 (TTM)
29.0
20.9
股息率
--
52周最高
$13.63
52周最低
$2.90
52周范围
排名56Top 81.7%
2.5
F-Score
改良版 Piotroski 分析
基于 10 年期基本面
疲弱 • 2.5 / 9 分
评分区间 (0-9)
8-9: 价值优异
6-7: 基本面强劲
4-5: 整体稳健
0-3: 表现疲弱
数据范围: 2016-2025
财务仪表盘
Q3 2025 数据
营业收入
$448.87M+78.12%
近4季度走势
每股收益
$0.18+275.78%
近4季度走势
自由现金流
$206.05M+323.98%
近4季度走势
2024 Annual 财报亮点
核心亮点
Annual Report Filed December 31 Form 40-F filed for fiscal year ended December 31, 2024; includes AIF and audited financials incorporated by reference.
Common Shares Outstanding Count 790,930,474 common shares outstanding reported as of December 31, 2024; securities registered on NYSE American exchange.
Greenhouse Gas Reduction Target Company targets 30% reduction in greenhouse gas emissions by 2030, using 2020 as baseline measurement for comparison.
Mine Life Extension Focus Plans include extending mine life beyond 2031 at New Afton Mine through successful resource conversion initiatives.
关注风险
Metal Price Volatility Risk Exposure to price volatility in spot and forward markets for metals, impacting realized production values and financial results.
Project Execution Uncertainties Risks inherent in mineral exploration, development, and construction timelines at Rainy River and New Afton mines.
Licensing and Permitting Delays Uncertainties and unanticipated delays associated with obtaining necessary licenses, permits, and authorizations in operating jurisdictions.
Global Economic Headwinds Fluctuations in currency exchange rates, inflation, tariffs, and global economic conditions may materially impact operations.
前瞻展望
New Afton Cost Reduction Expect C-Zone operating costs to be significantly lower than current B3 unit mining costs post-transition period.
New Afton Processing Capacity Intention to utilize existing capacity, successfully processing up to 16,000 tonnes per day at New Afton mill.
Infrastructure Stabilization Timeline Overall NATSF stabilization project completion is anticipated during the first half of the fiscal year 2026.
Resource to Reserve Conversion Focus areas include converting Mineral Resources to proven Mineral Reserves over the next few upcoming years.
同行对比
营业收入 (TTM)
$6.32B
$5.12B
$3.06B
毛利率 (最新季度)
85.5%
72.8%
53.9%
关键指标
股票代码 | 市值 | 市盈率 (TTM) | 净资产收益率 (TTM) | 负债率 |
|---|---|---|---|---|
| HL | $12.92B | 40.1 | 13.7% | 7.9% |
| IAG | $11.91B | 17.5 | 18.4% | 13.3% |
| HBM | $9.69B | 17.0 | 19.3% | 17.6% |
长期趋势
近4季度
营业收入
净利润
经营现金流
4季度营收复合增长率
19.6%
高速增长
4季度净利润复合增长率
36.7%
盈利能力强劲提升
现金流稳定性
100%
现金流表现优异
深度研究
下次财报:2026年4月27日
每股收益:-
|营业收入:-
财务数据
电话会议
财务报告
新闻
利润表
资产负债表
现金流量表
财务比率
变化率
利润表 | 过去12个月 |
|---|
无数据